Herbert Forest Working Bee

A small group of 6 gathered at Goblin Woods and after sorting the jobs to be done the group split into 3 lots of 2. Each if these set off to work in Hoods, Podocarp and Swallows. A variety of jobs were done mostly in returning signage to original order and track maintenance. Two seats were installed in the Hoods. Rebating of DoC 200 was done a few days earlier and traps are now fitted with mousetraps. 
Thanks to the team!